DTO/DSO/RME
DTO/DSO/RME Menu Main Menu Search Media Contacts


International Space Station On-Orbit Loads Validation
DTO 264


Overview
The purpose of this DTO is to ensure stable shuttle control system performance and acceptable loads on the Space Station Remote Manipulator System (SSRMS) induced by shuttle jet firings.

During planned SSRMS handling of payloads, there will be a brief pause at a specific planned SSRMS geometric configuration in the trajectory. At this configuration, crew inputs to SSRMS motion will be commanded, followed by an SSRMS brakes-on command. This will be performed three times to excite two lateral bending modes and one torsion mode of the SSRMS, while the SSRMS data system in the end effector will be active to measure the SSRMS transient load response.

History/Background
This is the first flight of DTO 264.


Section Index |  Main Index |  Search  | Contacts

Updated: 04/05/2001

Boeing NASA United Space Alliance

Editorial/Technical Comments: ShuttlePresskit