|
|
|
Mission Overview |
Flight Plan |
Payloads |
DTO/DSO/RME
Rendezvous | Extravehicular Activity | Media Contacts Crew Members | Shuttle Reference Data | Related Links | Media Assistance Download the STS-105 Acronym List in PDF ( 65.6 KB) Download the STS-105 Press Kit in PDF format for printing ( 1.2 MB) Download the Expedition 3 Press Kit in PDF format for printing ( 2.0 MB) Requires Adobe Reader 3.0 |
|
Discovery OV103 Launch: Thursday, August 09, 2001 5:38 PM (eastern time) |
| Mission Objectives |
| Top priorities for the STS-105 (7A.1) mission of Discovery are rotation of the International Space Station crew, bringing water, equipment and supplies to the station and completion of a series of spacewalks and robotics tasks. International Space Station Program priorities include the following tasks to be accomplished. --Water transfer from the shuttle to the station. The quantity will be determined during the mission. --Rotation of the Expedition Two and Expedition Three crews. --Transfer critical cargo from the shuttle middeck to the station. --Berth the Multipurpose Logistics Module to the station, check it out and transfer critical cargo to the space station, transfer and stow return cargo in the module and return the module to the cargo bay. --Spacewalk and robotics activities, including installation of the Early Ammonia Servicer and preparation for future station assembly. Among the preparation activities are laying heater cables for a future station truss segment. |
| Crew |
|
| : | James S. Voss |
| : | Yury V. Usachev |
| : | Susan J. Helms |
| : | Vladimir N. Dezhurov |
| : | Frank L. Culbertson, Jr. |
| : | Mikhail Tyurin |
| Commander: | Scott J. Horowitz |
| Pilot: | Frederick (Rick) W. Sturckow |
| Mission Specialist 1: | Patrick G. Forrester |
| Mission Specialist 2: | Daniel T. Barry |
| Launch | |
| Orbiter: | Discovery OV103 |
| Launch Site: | Kennedy Space Center Launch Pad 39A |
| Launch Window: | 2.5 to 5 minutes |
| Altitude: | Insertion 122 Nautical Miles; Rendezvous 240 Nautical Miles |
| Inclination: | 51.6 Degrees |
| Duration: | 11 Days 19 Hrs. 39 Min. |
| Vehicle Data | |
| Shuttle Liftoff Weight: | 4517989 lbs. |
| Orbiter/Payload Liftoff Weight: | 257748 lbs. |
| Orbiter/Payload Landing Weight: |
222275 lbs. |
| Software Version: | OI-28 |
| Space Shuttle Main Engines: (1 MB pdf) | ||
| SSME 1: 2052 | SSME 2: 2044 | SSME 3: 2045 |
| External Tank: ET-110A ( Super Light Weight Tank) |
|
SRB Set: BI109PF |
| Shuttle Aborts | |
Abort Landing Sites RTLS: Kennedy Space Center Shuttle Landing Facility TAL: Prime Zaragoza, Backups Ben Guerir and Moron AOA: Kennedy Space Center Shuttle Landing Facility
|
|
| Landing | |
| Landing Date: | 08/21/01 |
| Landing Time: | 1:17 PM (eastern time) |
| Primary Landing Site: | Kennedy Space Center Shuttle Landing Facility |
Editorial/Technical Comments: ShuttlePresskit