|
|
|
Mission Overview |
Flight Plan |
Payloads |
Experiments |
DTO/DSO/RME
Rendezvous | Extravehicular Activity | Mission Benefits | Media Contacts Crew Members | Shuttle Reference Data | Related Links | Media Assistance Download the STS-97 Acronym List in PDF ( 38.8 KB) Download the STS-97 Press Kit in PDF format for printing ( 1.7 MB) Requires Adobe Reader 3.0 |
|
Endeavour OV105 Launch: Thursday, November 30, 2000 10:06 PM (eastern time) |
| Crew |
|
| Commander: | Brent W. Jett |
| Pilot: | Michael J. Bloomfield |
| Mission Specialist 1: | Joseph R. Tanner |
| Mission Specialist 2: | Marc Garneau |
| Mission Specialist 3: | Carlos I. Noriega |
| Launch | |
| Orbiter: | Endeavour OV105 |
| Launch Site: | Kennedy Space Center Launch Pad 39B |
| Launch Window: | 4:01 |
| Altitude: | 173 Nautical Miles |
| Inclination: | 51.6 Degrees |
| Duration: | 10 Days 20 Hrs. 13 Min. |
| Vehicle Data | |
| Shuttle Liftoff Weight: | 4524410 lbs. |
| Orbiter/Payload Liftoff Weight: | 266185 lbs. |
| Orbiter/Payload Landing Weight: |
197879 lbs. |
| Payload Weights | |
| PVAA | 185 pounds |
| IEA | 17,000 pounds |
| LS | 245 pounds |
| Software Version: | OI-27 |
| Space Shuttle Main Engines: (1 MB pdf) | ||
| SSME 1: 2043 | SSME 2: 2054 | SSME 3: 2049 |
| External Tank: ET-105A ( Super Light Weight Tank) |
|
SRB Set: BI103PF/R074-99 |
| Shuttle Aborts | |
Abort Landing Sites RTLS: Kennedy Space Center Shuttle Landing Facility TAL: Zaragoza AOA: Edwards Air Force Base, California
|
|
| Landing | |
| Landing Date: | 12/11/00 |
| Landing Time: | 6:19 PM (eastern time) |
| Primary Landing Site: | Kennedy Space Center Shuttle Landing Facility |
| Payloads |
| Cargo Bay |
| PHOTOVOLTAIC ARRAY ASSEMBLY (PVAA): |
| INTEGRATED EQUIPMENT ASSEMBLY |
| THE LONG SPACER |
Editorial/Technical Comments: ShuttlePresskit